Monroeville Mall Gateway: 2025 RACP Application
Description
South Saturn Ridge's 2025 application sought $7.5 million in state assistance toward site preparation for the mall's redevelopment. The filing proposed clearing the existing mall buildings, improving utilities and stormwater systems, and constructing a new commercial destination. Its timetable placed demolition in April through November 2027. This applicant-authored record documents a proposal, not a municipal permit, grant award, or confirmed demolition schedule.
Open Full Viewer and Download Original require a member sign-in.
Use the reader controls to move page by page or jump straight to a specific page.